Please use this identifier to cite or link to this item: http://10.1.7.192:80/jspui/handle/123456789/11501
Full metadata record
DC FieldValueLanguage
dc.contributor.authorShah, Reema B.
dc.date.accessioned2023-04-20T10:57:21Z-
dc.date.available2023-04-20T10:57:21Z-
dc.date.issued2013-06-01
dc.identifier.urihttp://10.1.7.181:1900/jspui/123456789/4049
dc.identifier.urihttp://10.1.7.192:80/jspui/handle/123456789/11501-
dc.description.abstractCoal fired thermal power plants generate major portion of India's electricity. In a typical thermal power plant the raw coal is crushed and pulverized in a mill to a size finer than a face powder. The primary air supply dries and transports the coal into the boiler furnace. The coal burns in to the furnace to generate superheated steam which drives a turbine connected to an alternator to generate electricity. This study examines the factors responsible for the efficiency of the Captive power plants (CPPs). The purpose of the study is to arrive at the efficiency parameters for the CPPs as a whole and also various components of the CPPs. The term efficiency as defined solely for power generation only considers the useful electrical output to effective heat input to the power plant. But much of the energy content of the available energy source is wasted by inefficiencies the energy conversion and distribution processes. So it is necessary to find the efficiency of all the equipments. Modelling is needed for understanding and predicting the behaviour and characteristics of thermal systems. This thesis mainly focuses on the important components of a power plant which are boiler, turbine. The development of these simulations in LabVIEW, it is assumed that there are no feed heaters when developing this model. The model was validated with a real power plant generating 600 KW. A sensitivity analysis was implemented in order to find the most sensitive inputs and outputs for the energy production.en_US
dc.publisherInstitute of Technologyen_US
dc.relation.ispartofseries11MICC16en_US
dc.subjectIC 2011en_US
dc.subjectProject Report 2011en_US
dc.subjectIC Project Reporten_US
dc.subjectProject Reporten_US
dc.subject11MICen_US
dc.subject11MICCen_US
dc.subject11MICC16en_US
dc.subjectControl & Automationen_US
dc.subjectControl & Automation 2011en_US
dc.subjectIC (Control & Automation)en_US
dc.titleEnergy Efficiency and Audit of Captive Power Planten_US
dc.typeDissertationen_US
Appears in Collections:Dissertations, E&I

Files in This Item:
File Description SizeFormat 
11MICC16.pdf11MICC162.44 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.