Please use this identifier to cite or link to this item:
http://10.1.7.192:80/jspui/handle/123456789/11514
Title: | Boiler Critical Control-Loops Optimization |
Authors: | Gandhi, Ravi |
Keywords: | IC 2010 Project Report 2010 IC Project Report Project Report 10MIC 10MICC 10MICC05 Control & Automation Control & Automation 2010 IC (Control & Automation) |
Issue Date: | 1-Jun-2012 |
Publisher: | Institute of Technology |
Series/Report no.: | 10MICC05 |
Abstract: | In a power plant, Boiler control is the most complex and critical control problem. Ef- ciency of entire power plant mainly depends, upon the e ectiveness of the boiler per- formance via control loops of boiler. If the control-loops of the boiler are optimized and controlled e ectively then the overall plant e ectiveness and performance can be drasti- cally maximized . We have worked on furnace draught control-loop optimization based on DCS(Toshiba make) based control logic and design optimized state feedback controller for boiler drum level control-loop based on separation principle with state estimation techniques.Designing the optimized control with observer and controller based on LQR needs determination of matrix Q , R , Kc and Ko accurately which causes minimum estimation error with optimized control on plant open-loop linearized model. |
URI: | http://10.1.7.181:1900/jspui/123456789/3494 http://10.1.7.192:80/jspui/handle/123456789/11514 |
Appears in Collections: | Dissertations, E&I |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
10MICC05.pdf | 10MICC05 | 4.85 MB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.