Title: | Determination of Time delay and Rate of Temperature Change during Tyre Curing (Vulcanizing) Cycle |
Authors: | Pandya, Mukund B. |
Keywords: | Mechanical 2010 Project Report Project Report 2010 Mechanical Project Report 10MMET 10MMET10 Thermal Thermal 2010 Curing Process Delay Time SST k-w! model Turbulent Flow Analysis |
Issue Date: | 1-Jun-2012 |
Publisher: | Institute of Technology |
Series/Report no.: | 10MMET10 |
Abstract: | Curing is one of the most important steps in the tyre manufacturing process. During this process, a green tyre is formed to the desired shape and the compound is con- verted to a strong, elastic material to meet tyre performance needs. The process of curing is usually accomplished under pressure and an elevated temperature provided by the mould. The curing process is energy consuming and has a strong e ect on material properties. To attain an optimal state of cure for tyre for better quality of product and to minimize the cycle time requires uid ow analysis inside the tyre bladder. To minimize the temperature di erence and for nding out the delay time in OTR tyre curing process,the simulations were carried out using CFD software package ANSYS FLUENT 13. The intent of carrying the CFD analysis is to observe the internal ow physics in a rubber tyre bladder. Transient analysis of 2-D axis sym- metric case for a conventional cycle used in OTR tyre curing is presented. The temperature and pressure distribution inside the tyre bladder is simulated by using turbulent SST k-! model. The temperatures at top and bottom points of bladder are estimated by means of conjugate heat transfer approach. At the end, the re- sults are analyzed and simulated results are validated with experimental data. It was found that the results from the CFD simulation and experiments are in good agreement. Finally, the temperature di erence in LTHW circulation is reduced to 4oC from 38oC by changing the ow rate at outlet from 15m3=hr to 38m3=hr and delay time is reduced from more than 60 minutes to the 20 minute. Reduction of delay time will improve product quality as well as it reduces utility cost. |
URI: | http://10.1.7.181:1900/jspui/123456789/3562 |
Appears in Collections: | Dissertation, ME (Thermal) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
10MMET10.pdf | 10MMET10 | 4.79 MB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.