Please use this identifier to cite or link to this item: http://10.1.7.192:80/jspui/handle/123456789/4263
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRathod, Raj Karansinh-
dc.date.accessioned2013-12-18T09:51:46Z-
dc.date.available2013-12-18T09:51:46Z-
dc.date.issued2013-06-01-
dc.identifier.urihttp://10.1.7.181:1900/jspui/123456789/4263-
dc.description.abstractIn an increasingly intense competitive environment, the industries need to improve their production techniques and quality ,where shortest lead time is desired by everyone.For that we need to find out the factors causing the increased lead time and solve them. In this project a small scale industry manufacturing globe valves is chosen to reduce the higher lead time of delivering the products to the customer. For the same current process plan is studied and time required for each is obtained. Problems affecting the lead time are identified. Identified problems are analysed using work study techniques like ABC analysis, priority matrix and Pareto analysis. The result of the analysis shows the critical problems affecting lead time. Assembly station is conceptualized to reduce the lead time. Alternate layouts are considered and evaluated using craft method.en_US
dc.publisherInstitute of Technologyen_US
dc.relation.ispartofseries11MMCM14en_US
dc.subjectMechanical 2011en_US
dc.subjectProject Reporten_US
dc.subjectProject Report 2011en_US
dc.subjectMechanical Project Reporten_US
dc.subject11MMCMen_US
dc.subject11MMCM14en_US
dc.subjectCIMen_US
dc.subjectCIM 2011en_US
dc.titleLead Time Reduction in a Small Scale Industryen_US
dc.typeDissertationen_US
Appears in Collections:Dissertation, ME (CIM)

Files in This Item:
File Description SizeFormat 
11MMCM14.pdf11MMCM141.85 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.