Please use this identifier to cite or link to this item: http://10.1.7.192:80/jspui/handle/123456789/6127
Full metadata record
DC FieldValueLanguage
dc.contributor.authorPatel, Bhavinkumar Jayantilal-
dc.date.accessioned2015-09-11T05:50:15Z-
dc.date.available2015-09-11T05:50:15Z-
dc.date.issued2015-06-01-
dc.identifier.urihttp://hdl.handle.net/123456789/6127-
dc.description.abstractTo remain competitive into the market company has to control various significant operating parameters like production rate, cycle time, customer demand, production cost etc. Cycle time being one of the most important parameter of the customer satisfaction every organization is attempting to squeeze the cycle time. In Transformer Manufacturing Company also cycle time is a major issue. Hence in this project work is carried out to reduce the cycle time using the lean manufacturing concept. First past data is collected and the timing of each process is obtained. Based on the data processes are identified consuming maximum time and hence contributing maximum to the total cycle time. In this project fixture design and automation approach is used to reduce the cycle time.en_US
dc.publisherInstitute of Technologyen_US
dc.relation.ispartofseries13MMCM13;-
dc.subjectMechanical 2013en_US
dc.subjectProject Reporten_US
dc.subjectProject Report 2013en_US
dc.subjectMechanical Project Reporten_US
dc.subject13MMCMen_US
dc.subject13MMCM13en_US
dc.subjectCIMen_US
dc.subjectCIM 2013en_US
dc.titleCycle Time Reduction in Transformer Manufacturing Industryen_US
dc.typeDissertationen_US
Appears in Collections:Dissertation, ME (CIM)

Files in This Item:
File Description SizeFormat 
13MMCM13.pdf13MMCM1314.08 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.