Please use this identifier to cite or link to this item: http://10.1.7.192:80/jspui/handle/123456789/9327
Full metadata record
DC FieldValueLanguage
dc.contributor.authorThanki, Shashank J.-
dc.contributor.authorJha, Kaushal Kumar-
dc.contributor.authorThakkar, Jitesh J.-
dc.date.accessioned2020-08-28T07:43:29Z-
dc.date.available2020-08-28T07:43:29Z-
dc.date.issued2020-01-16-
dc.identifier.issn0268-3768-
dc.identifier.urihttp://10.1.7.192:80/jspui/handle/123456789/9327-
dc.descriptionThe International Journal of Advanced Manufacturing Technology, Vol. 106 (1) January, 2020en_US
dc.description.abstractThis paper reports a case study of an Indian aerospace industry, XYZ Aeronautics Limited, with an objective to bring reduction in cycle time of outsourcing process. The focus is to identify bottleneck areas and investigate into the improvement opportunities. The paper enriches the present body of knowledge by contributing a methodology and its application for a real-life case study to understand the implications of outsourcing on operational planning. The analysis reported in this research is based on the available knowledge and extensive experience gained while working in the outsourcing department of the case organization for a long period of time. The research integrates action research, longitudinal case study research, and simulation for the detailed and scientific analysis of the problem for a case organization. The study employs a six-step analysis approach for investigating the outsourcing-related issues in case organization. The simulation study has helped to reduce the average cycle time of purchase order placement to 69 days, i.e., improvement by 33.65% over the present 104 days. This would enable the case organization to conduct “what-if” analysis and evaluate the implications of bringing improvements in select bottleneck areas for reducing cycle time of outsourcing process. The investigation is expected to help managers to negotiate on appropriate dimensions with vendors and convince them for the adoption of e-sourcing, e-contract, and e-catalog technologies.en_US
dc.publisherThe International Journal of Advanced Manufacturing Technologyen_US
dc.subjectFaculty Paperen_US
dc.subjectFaculty Paper, Managementen_US
dc.subjectManagement, Faculty Paperen_US
dc.subjectAction Researchen_US
dc.titleCycle time reduction in outsourcing process: case of an Indian aerospace industry.en_US
dc.typeFaculty Papersen_US
Appears in Collections:Faculty Papers, IM

Files in This Item:
File Description SizeFormat 
SST_Cycle time reduction in outsourcing process case of an Indian aerospace industry.pdf91.39 kBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.