Please use this identifier to cite or link to this item:
http://10.1.7.192:80/jspui/handle/123456789/3657
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Singh, Ranteshwar | - |
dc.date.accessioned | 2012-07-17T07:53:17Z | - |
dc.date.available | 2012-07-17T07:53:17Z | - |
dc.date.issued | 2012-06-01 | - |
dc.identifier.uri | http://10.1.7.181:1900/jspui/123456789/3657 | - |
dc.description.abstract | Fundamental component of World Class Manufacturing (WCM) is Total Produc- tive Maintenance (TPM) along with other components like Total Quality Manage- ment (TQM). In this project investigation is conducted in a company manufacturing automotive component to determine the Overall Equipment E ectiveness (OEE) of machine shop.The losses associated with equipment eff ectiveness are identifi ed. Soft- ware for the calculation of OEE is developed in Visual Basic which takes the data from the controller developed in-house. All the pillars of TPM are implemented in a phased manner. | en_US |
dc.publisher | Institute of Technology | en_US |
dc.relation.ispartofseries | 10MMCM14 | en_US |
dc.subject | Mechanical 2010 | en_US |
dc.subject | Project Report | en_US |
dc.subject | Project Report 2010 | en_US |
dc.subject | Mechanical Project Report | en_US |
dc.subject | 10MMCM | en_US |
dc.subject | 10MMCM14 | en_US |
dc.subject | CIM | en_US |
dc.subject | CIM 2010 | en_US |
dc.title | Total Productive Maintenance (TPM) Software Development For Overall Equipment Effectiveness (OEE) And Implementation | en_US |
dc.type | Dissertation | en_US |
Appears in Collections: | Dissertation, ME (CIM) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
10MMCM14.pdf | 10MMCM14 | 181.73 MB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.