Please use this identifier to cite or link to this item: http://10.1.7.192:80/jspui/handle/123456789/3657
Title: Total Productive Maintenance (TPM) Software Development For Overall Equipment Effectiveness (OEE) And Implementation
Authors: Singh, Ranteshwar
Keywords: Mechanical 2010
Project Report
Project Report 2010
Mechanical Project Report
10MMCM
10MMCM14
CIM
CIM 2010
Issue Date: 1-Jun-2012
Publisher: Institute of Technology
Series/Report no.: 10MMCM14
Abstract: Fundamental component of World Class Manufacturing (WCM) is Total Produc- tive Maintenance (TPM) along with other components like Total Quality Manage- ment (TQM). In this project investigation is conducted in a company manufacturing automotive component to determine the Overall Equipment E ectiveness (OEE) of machine shop.The losses associated with equipment eff ectiveness are identifi ed. Soft- ware for the calculation of OEE is developed in Visual Basic which takes the data from the controller developed in-house. All the pillars of TPM are implemented in a phased manner.
URI: http://10.1.7.181:1900/jspui/123456789/3657
Appears in Collections:Dissertation, ME (CIM)

Files in This Item:
File Description SizeFormat 
10MMCM14.pdf10MMCM14181.73 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.