Please use this identifier to cite or link to this item: http://10.1.7.192:80/jspui/handle/123456789/7362
Full metadata record
DC FieldValueLanguage
dc.contributor.authorPatel, Kalpan-
dc.contributor.authorSarda, Dilip-
dc.contributor.authorShah, Balkrushna-
dc.date.accessioned2017-02-03T07:37:48Z-
dc.date.available2017-02-03T07:37:48Z-
dc.date.issued2015-11-26-
dc.identifier.citation5th International Conference on Current Trends in Technology, NUiCONE - 2015, Institute of Technology, Nirma University, November 26 – 28, 2015en_US
dc.identifier.urihttp://hdl.handle.net/123456789/7362-
dc.description.abstractWorldwide icecream is considered favorite dessert and its consumption is increasing day by day. Icecream manufacturing comprises of processes like pasteurization, homogenization, chilling of mix, and freezing. Around 65°–70°C of temperature is required for pasteurization which is achieved by using hot water generated by electricity or gas or other fuels. Around 1°C chilled water is required to be supplied by refrigeration for cooling the icecream mix. Aging of this mix is to be done for 5–6 h in aging tank at 4°C and then it is taken to the freezer to produce icecream. Also, icecream plant requires large amount of hot water for cleaning and sanitizing the equipments, piping, utensils and washing floors. As in icecream manufacturing process, both heating and cooling are required; the use of heat-pump may prove to be a better solution. In this paper, detailed economic analysis has been given for heat pump integrated icecream making plant. The aim of process integration is to reduce the energy consumption and, thereby, the operating cost of the icecream making. Heating and cooling requirement for 2,000 L of icecream production per day has been calculated. Suitable heat pump has been integrated to the existing plant in order to have benefit of heating utility for partial pasteurization upto temperature 58°C and cooling utility for the partial cooling of mix upto temperature 18°C. Saving of around 34% of energy consumption is made by the heat pump integrated systems. As per the calculations, simple payback period for modified icecream making plant with heat pump is just 2.2 years.en_US
dc.publisherInstitute of Technology, Nirma University, Ahmedabaden_US
dc.relation.ispartofseriesITFME030-7;-
dc.subjectMechanical Faculty Paperen_US
dc.subjectFaculty Paperen_US
dc.subjectITFME030en_US
dc.titleEconomic Analysis Of Heat Pump Integrated Ice Cream Making Planten_US
dc.typeFaculty Papersen_US
Appears in Collections:Faculty Paper, ME

Files in This Item:
File Description SizeFormat 
ITFME030-7.pdfITFME030-7265.1 kBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.